Latest news

Last Call For Dogger Bank Wind Farm Scholarship Fund Applicants

21st August 2023 in Community News, Press releases

  • 62 scholarships are available during the construction of the wind farm, for students in these communities studying science, technology, engineering and maths subjects to support the cost of further education.
  • The programme is open to students in South Tyneside, Redcar and Cleveland and East Riding of Yorkshire.
  • The scholarship fund will support students undertaking courses focussed on science, technology, engineering and maths (STEM) courses, to help young people prepare for working life in a net zero world.

Students from coastal communities in the north and north-east of England are reminded that the third year scholarship fund closes for applications in less than two weeks.

Dogger Bank Wind Farm’s Scholarship Fund provides grants of £5,000 to local students undertaking science, technology, engineering and maths (STEM) courses in further education, with a total of 62 scholarships being awarded during the world’s largest wind farm’s construction phase.

The scholarship fund focuses on the areas of East Riding of Yorkshire, and Redcar and Cleveland, where the windfarm connects to the National Grid, as well as South Tyneside, where the Operation and Maintenance Base will be located.

Students should take note they only have until 1 September 2023 to apply for this year’s round of support. Further details and how to apply can be found at https://doggerbank.com/about/community/.

Oliver Cass, Project Director from Dogger Bank Wind Farm said

“The third round of the scholarship fund has once again proven very popular, it’s great to see the quality of applicants remains high and we encourage local students to make their application before the closing date next month. As we build the world’s largest offshore wind farm, we’re proud to continue supporting young people at a key stage in their educations and preparing for working life in a net zero world.”

Dogger Bank has already awarded 50 scholarships to date to local students undertaking science, technology, engineering, and maths (STEM) courses in further education to help young people prepare for working life in a net zero world and support students with tuition fees at a key stage in their educations.

Dogger Bank Wind Farm will be located more than 130 km off the northeast coast and will generate enough renewable energy to power six million UK homes. A joint venture partnership between SSE Renewables (40%), Equinor (40%) and Vårgrønn (20%). The wind farm is being built in three consecutive 1.2 GW phases: Dogger Bank A, B and C – connecting to the National Grid in both East Riding of Yorkshire and on Teesside.

SSE Renewables is leading on the development and construction of Dogger Bank Wind Farm, and Equinor will operate the wind farm on completion for its expected operational life of around 35 years.

In June 2021, Dogger Bank Wind Farm unveiled plans for a £1 million construction fund to support coastal communities where its onshore infrastructure is being developed. The programme includes a significant investment in science, technology, engineering, and maths, as well as an operators fund to support local causes. Further information is available at www.doggerbank.com/about/community/

Further details on the scholarship fund and community investment from Dogger Bank can be found here.

Ends

Picture caption: The scholarship fund will support students studying science, technology, engineering, and maths, to help prepare them for the highly skilled jobs in a net zero world.